Presidential Communications Operations Office



  PIA Bldg, Visayas Ave, Diliman, Quezon City, Philippines
  Friday, 31 March 2017 News Before 1 Feb 2012. Click for Latest
Web PIA  
 
home
 
about
 
fotos
 
info
 
links
 
ncrr01carr02r03calmimr05r06r07r08r09r10r11r12r13
PBB Guidelines 2016
Click to Open
PIA Snapshot

120201-r6-goodjob
PIA Online
One Mindanao eNewsmagazine
One Visayas eNewsletter
One Luzon eNewsmagazine
ST@R eNewsmagazine
PIA Members Only:
PMIS | PANP Phone Directory
PIAEA Corner:
Application | View PIAEA Site
Special News Editions:
English.Tagalog.Cebuano
Ilocano.Waray.Hiligaynon
Pangasinan.Other
PIA Specials:
NEW! Cabinet Officials
Jobs.Slides.Specials.Ads. Events.ASEAN.Multimedia
PIA News Archive:
English.Tagalog.Cebuano
Waray.Hiligaynon.Ilocano
Pangasinan.All
Information to Empower Filipinos
English NewsFoto ArchivesRegional WatchOFW Watch
FrontpageHeadlines by RegionNews ArchivePIA SpecialsICT News

PIA Press Release
Monday, January 30, 2012

 

DPWH implements river control project in Albuera, Leyte

TACLOBAN CITY, Leyte, Jan 30 (PIA) -- The river passing through Barangay Soob, Albuera, Leyte has been causing heavy damage in said area whereas a part of the mountain located in the same place is being eroding and threatening to wash away the national highway.

This was reported by Lino Francisco C. Gonzalez, engineer of the Leyte Fourth Engineering District of the Department of Public Works and Highways, Region 8. According to him, there is an urgent need for a river control protection to stop the water from overflowing.

Relative to this, Gonzales said that the municipal Mayor of Albuera, Leyte requested assistance from the engineering ofice to conduct a site survey, which was immediately acted on.

It was revealed that due to the recent typhoons and heavy rains, the bank of the river has been eroding, which is turn, is fast eroding the soil.

Gonzalez added that barangay officials are apprehensive that in the next calamity or typhoon, the national highway might be totally damaged and washed away. They are requesting that priority be given in repairing the already damaged sections to prevent further destruction.

It was bared that there is a plan, costing around P7 million, for the rehabilitation of the said places.(maa/PIA-8)

Latest Stories
  • DOST project beneficiary produces biggest 'ulang' (R02)
  • Solar energy to light up 75 more houses in off-grid areas in NegOr (R07)
  • DA plans to use Mindanao program in Luzon (R11)
  • DSWD 1 marks its 61st anniversary celeb in February (R01)
  • 500 poor families get 'bags of blessing' (R06)
  • Close to 200 Negros Occidental police officers get promotion (R06)
  • NGO urges public to collect, propagate seeds to create native tree forests in CV (R07)
  • Police Information Officers receives commendation medals (R06)
  • DSWD brings Pantawid Pamilya program to Dumaguete City (R07)
  • LGU issues guidelines on use of municipal filling station (CAR)
  • NGO to hold free breast, cervical cancer screening (R07)
  • Aklan detainees trained on proper waste management (R06)
  • Hiligaynon news: DOLE 6 may bag-o nga direktor (R06)
  • Mangrove tree planting to highlight World Wetlands Day (R06)
  • Balikbayan finds ulang production profitable (R02)
  • Hiligaynon news: Impormasyon sa populasyon sa Iloilo nagapakita pagkinahanglan sa pagmanehar sing maayo (R06)
  • Various activities to mark World Wetlands Day in Iloilo (R06)
  • Tagalog News: Tapul Reef, ipinapadeklarang fish sanctuary (MIM)
  • Hiligaynon news: Alert Level sa Yemen napanubo sa level 2 DFA (R06)
  • P118-M worth of Infra projects implemented by Dipolog in 2011 (R09)
    FotoCatalogSitestats  
    GOOD NEWS Series
    goodnews
    PIA Special Sites:

    ASEAN Philippines

    Philippine Official Gazette | Office of the President | Presidential Communications Operations Office
    For comments and feedback, please email PIA Newsdesk
    Copyright © 2005 Philippine Information Agency
    PIA Building, Visayas Avenue, Diliman, Quezon City 1101 Philippines