 FLOOD CONTROL PROJECTS. Project Director Fidel Ginez (second from right)of the Agno River Flood Control Office outlines flood control projects in Pangasinan and Tarlac under Phase 2 worth P5.9 billion during the KBP Forum at the Philippine Information Agency office. The projects, he says, include improvement of existing river channel, heightening of existing dike system and construction of new earth dike and bank protection. Joining him as guest in the weekly media forum is District Engineer Rodolfo Dion (3rd from left) of the second Pangasinan engineering district, who announces that by August 15, elevation of Arellano Street which used to be under water during heavy down pour or during high tide, will have been complete. Mediamen present are Ding Micua of the Philippine News Agency, Noel Sibayan of Love Radio - FM, Bernie Errasquin of DZMQ - Radyo ng Bayan, Danny O. Sagun of PIA - Pangasinan, Edmund Abobo and Karen Crisostomo of Bombo Radyo. (photo by rolana.oe / PIA - Pangasinan) |