Presidential Communications Operations Office



  PIA Bldg, Visayas Ave, Diliman, Quezon City, Philippines
  Friday, 26 April 2019 News Before 1 Feb 2012. Click for Latest
Web PIA  
 
home
 
about
 
fotos
 
info
 
links
 
ncrr01carr02r03calmimr05r06r07r08r09r10r11r12r13
 << April 2019 >> 
S M T W T F S
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30
Special News Editions:
English.Tagalog.Cebuano
Ilocano.Waray.Hiligaynon
Pangasinan.Other
PIA Specials:
NEW! Cabinet Officials
Jobs.Slides.Specials.Ads. Events.ASEAN.Multimedia
Visitors since 15 Feb 2011:
PIA News Archive:
English.Tagalog.Cebuano
Waray.Hiligaynon.Ilocano
Pangasinan.All
PIA Archive News Reader

PIA Press Release
2010/03/16

Tagalog News: Visayas at Mindanao patuloy pa rin na makararanas ng rotating brownouts

by BD Enestois

Manila (16 March) -- Inihayag ng National Grip Corporation of the Philippines (NGCP) na patuloy na makararanas ng rotating brownouts ang mga lalawigan sa Mindanao at sa Visayas samantalang normal na ang power supply situation sa Luzon.

Patuloy na makararanas ang Mindanao ng generation deficiency na 632MW sanhi ng kakulangan sa kapasidad ng mga hydropower plants ng National Power Corporation dahil natutuyo na ang mga imbakan ng tubig dahil sa tagtuyot dala ng El Niņo.

Dahil dito umaabot sa lima hanggang labing-dalawang oras ang rotating brownouts sa Mindanao mula pa noong nakaraang buwan.

Mayroong naitalang peak load ang Mindanao na 1,437MWs samantalang umaabot lang sa 805MW ang available capacity ng mga power generators dito.

Nakipagpulong na rin ang pamahalaan sa mga miyembro ng Mindanao Electric Power Alliance (MEPA) para resolbahin ang power crisis sa rehiyon.

Samantala, umabot na sa 163MW ng power supply deficiency sa Visayas kagabi sanhi ng pag-shutdown ng Cebu Diesel Power Plant na nagsusuplay ng may kabuuang 25MWs sa naturang isla.

Hanggang ngayon naka-emergency shutdown pa rin ang Cebu Energy Development Corp.(CEDC) at Leyte Geothermal Power Plant (LGPP) unit 2 na pag-aari at pinamamahalaan ng Green Core Power.

Naitala na 1, 223MWs ang peak demand sa Visayas na mas mataas kaysa sa available capacity nito na 1,060MWs. (PIA 12) [top]

|«  prev  next  »|
DAILY NEWS LIST:
»BIR to pursue high visibility awareness campaign ? Commissioner Tan-Torres
»SSS condones penalties on unremitted contributions by employers
»Feature: Bahay ni Sto. Tomas, a haven for unwanted pregnancies
»CTFRB conduct seminar for Tagum tricycle drivers
»Local terrorists murder mine worker, abduct siblings in Comval
»Doctors push for mercury ban in health care
»500 Project REY scholars recognized
»Cagayan de Oro to host 19th Mindanao business conference
»Women sector pushes IEC on global warming
»Panabo to stage bangus-grill
|«  prev  next  »|

Philippine Official Gazette | Office of the President | Presidential Communications Operations Office
For comments and feedback, please email PIA Newsdesk
Copyright © 2005 Philippine Information Agency
PIA Building, Visayas Avenue, Diliman, Quezon City 1101 Philippines