Presidential Communications Operations Office



  PIA Bldg, Visayas Ave, Diliman, Quezon City, Philippines
  Thursday, 18 July 2019 News Before 1 Feb 2012. Click for Latest
Web PIA  
 
home
 
about
 
fotos
 
info
 
links
 
ncrr01carr02r03calmimr05r06r07r08r09r10r11r12r13
 << July 2019 >> 
S M T W T F S
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
Special News Editions:
English.Tagalog.Cebuano
Ilocano.Waray.Hiligaynon
Pangasinan.Other
PIA Specials:
NEW! Cabinet Officials
Jobs.Slides.Specials.Ads. Events.ASEAN.Multimedia
Visitors since 15 Feb 2011:
PIA News Archive:
English.Tagalog.Cebuano
Waray.Hiligaynon.Ilocano
Pangasinan.All
PIA Archive News Reader

PIA Press Release
2010/02/25

Feature: Accessible drinking water for Dabaonons becoming a reality

by Jean Duron-Abangan

Tagum City (25 February) -- Drinking water has remained a costly commodity in Davao del Norte but it will soon be within reach now that the Davao Integrated Development Programme (DIDP) gets into community water supply development.

In an interview, Davao del Norte Planning and Development Chief Josie Jean Rabanoz noted how people in the province are largely depending on bottled mineral water and peddled water in tanks for their drinking use.

To address such need, she said the provincial government is taking stride in making water available right at the community through implementing a project introduced by DIDP in cooperation with Japan International Cooperation Agency (JICA).

Funded by JICA, water supply projects are now being put in place in pilot areas among which are Barangay Alejal, Carmen in Davao del Norte; Cabidianan, Nabunturan in Compostela Valley; Waan in Davao City; Baon, San Isidro in Davao Oriental; and Bangkal, Matan-on Davao del Sur.

Rabanoz said water supply in Davao del Norte is good only for domestic use such as washing clothes, taking a bath but is not fit for human consumption.

"Chlorination is not enough, there must be a water treatment unit to get rid of harmful substances," she said referring to the water supply system project that would be pilot tested in Barangay Alejal through DIDP.

Once made operational in July 2010, the water supply project would be able to serve around 400 households.

Rabanoz is optimistic that the technology introduced by DIDP with JICA would eventually make potable supply much accessible and affordable as well.

The provincial government would be incurring substantial cost of investment for such project but Rabanoz said that the "water supply that residents would be getting is a lot cheaper than the ones they are buying."

"This would eventually become an income-generating (venture of the barangay) but there should be collaborative efforts and cooperation among barangay officials and residents," she said.

In a separate interview, DIDP Assistant Executive Director Grace Magalona explained that the Local Governance and Rural Empowerment Project (LGREP) of DIDP, through which the water supply system development is being implemented, is integrating community organizing as one of its components.

Before the water supply development came along, DIDP had already conducted trainings on ground water supply detection, community organizing, and designing of small water supply facilities.

Residents in areas with level II water supply system would be organized into Barangay Water Supply Associations (Bawasa) which would take care of collecting fees necessary to sustain the water supply operation, Magalona explained. (PIA XI) [top]

|«  prev  next  »|
DAILY NEWS LIST:
»Anti-poverty program to focus on community-driven development
»DOST XI organizes energy audit team
»Bishops told: For heaven's sake, stop bullying Cabral
»P10-M projects eyed for KAMADI district
»Davao Light encourages consumers to save on power usage
»Human rights advocates urge implementation of RA 9851
»NEDA ICC-CABCOM approves three social and infra projects
»Musikahan Himig Handog winners named
»Feature: Accessible drinking water for Dabaonons becoming a reality
»Youths found still lacking knowledge on HIV/AIDS
|«  prev  next  »|

Philippine Official Gazette | Office of the President | Presidential Communications Operations Office
For comments and feedback, please email PIA Newsdesk
Copyright © 2005 Philippine Information Agency
PIA Building, Visayas Avenue, Diliman, Quezon City 1101 Philippines